Education / UCD Belfield, Dublin

O’Brien Centre for Science

Asbestos-panel removal, new floor openings and dismantling of the concrete link bridge between two operational science buildings.

O’Brien Centre for Science at UCD Belfield during the works
01 / Understand

The challenge.

  • Asbestos panels needed removal before demolition could proceed.
  • Live services and operational buildings surrounded the work areas.
  • The link bridge required a planned lifting and removal sequence at height.
02 / Control & deliver

Harte’s solution.

  • Coordinated specialist asbestos removal ahead of structural work.
  • Formed floor openings using controlled cutting, propping and dust suppression.
  • Used Brokk demolition and a coordinated crane plan, with scaffold protection and exclusion zones.
The result

Delivery.

Floor openings formed and the concrete link bridge dismantled between operational science buildings.