Previous Projects

Location: Custom House, Belfast, Northern Ireland.

Client: Straidorn Property Investors and Developers.

Job Description: Demolition and Alterations to a Grade B+ Listed Building as principle contractor.

  • Site Setup as per CDM Regulations 2015 including installation of site hoarding, entrance gates and 110V electric supplies to all four floors along with welfare.
  • Large strip out and structural alterations to a B+ listed four storey building.
  • Asbestos removal throughout.
  • Removal of all loose fixtures, fittings, flooring, ceilings, internal, walls & stripped out all M&E.
  • Temporary works designed and installed to maintain structural integrity.
  • Structural alterations to concrete floors.

Location: Carrickfergus, County Antrim, Northern Ireland.

Client: Causeway Asset Management.

Job Description: Demolition and Site Clearance of a large factory site as Principal Contractor.

  • Site Setup as per CDM Regulations 2015 including site fencing and welfare facilities.
  • Construction Phase Plan compiled and issued.
  • Removal of 2 large steel sheds, 2 nr large factory buildings and associated link bridge.
  • Asbestos Removal throughout.
  • Multiple concrete yards removed, crushed and stockpiled for reuse under the WRAP protocol (Graded as 6F2).
  • Temporary Works designed and installed to maintain associated link bridge whilst demolition works took place.
  • Dust control in the form of cannons, Noise Monitors and Vibration Monitors were installed and monitored by site management team to ensure the local community remained unaffected by the demolition works.
  • Waste segregation and disposal off site to local recycling facilities.

Location: Kilroot , Carrickfergus.

Contractors: EP UK Investments

Job Description:

  • Site Setup as per CDM Regulations 2015.
  • Construction Phase Plan compiled and issued.
  • Site Briefing/Inductions.
  • Demolition of 3 nr GCB Rooms.
  • Removal of 3 large steel bridge structures, dismantled and lowered by overhead gantry crane.
  • Protection of existing live services including pressurised hydrogen lines.
  • Removal of all waste off site in line with IS014001 procedures.
  • Detailed traffic management plan drawn up and implemented.

Location: Morrison’s Quay, Cork city centre, County Cork, Ireland.

Contractor: Elliott Building and Civil Engineering Ltd.

Job Description: Demolition, Alterations and Asbestos Removal to the Old Moore’s Hotel located in a busy city centre environment.

  • Demolition of three number buildings.
  • Partial demolition and preservation of adjacent listed building.
  • Complete asbestos removal throughout as required.
  • Internal soft strip of all buildings.
  • Temporary works internal propping designed and installed to maintain structural integrity of adjacent listed building.
  • Surrounded by busy road network requiring a detailed traffic management plan.
  • Noise restrictions with limited access.
  • Site clearance ready for new build.
  • Waste segregation and disposal off site to local recycling facilities.

Location: Titanic Quarter, Belfast, Northern Ireland.

Contractors: Fabrite – Facades – Solutions – Fit out – Construction.

Job Description: 24hr shift demolition of viewing galleries, steel/concrete staircase and feature walls with internal scaffolding to protect existing walls and floor finishes.

  • Internal Scaffolding and protecting of existing walls and floor finishes.
  • Demolition of viewing galleries with specialist demolition equipment in the form of Brokk.
  • Demolition and removal of steel / concrete staircase.
  • Removal and disposal of acoustic walling.
  • Removal and disposal of feature walls throughout.
  • Job was executed over 24hr shifts seven days a week due to programme restrictions.

Location: BT Tower , Belfast city centre , Northern Ireland.

Contractors: Graham

Job Description:

  • Internal Soft strip of 11 storey office building including floor finishes, ceilings etc.
  • Removal of all waste down throughout each floor.
  • Multiple floors working at any one times.
  • Programme Staggered over 2 phases.
  • Coordination of deliveries of lorries and plant required as multiple contractors working on the site at all times.
  • Follow the detailed traffic management plan due to location of busy city centre site..

Location: Dundrum Shopping Centre, Dublin

Contractor: Mac-Group

Job Description: Complete Demolition and Alterations to Dundrum Shopping Centre while building remained live.

  • Complete strip out of 5 Storey building including all M&E.
  • Removal and disposal of escalators.
  • Design and Implementation of Temporary Works throughout various phases.
  • Core Drilling throughout the 5 floors.
  • Waste Segregation and disposal to local recycling facilities.
  • Structural alterations to concrete floors and frame as required.
  • Specialist demolition with electric Brokk and saw cutting as required.

Location: St Paul’s ,Navan.

Contractor: Felix O’Hare

Job Description: Complete Demolition of a School and Modular Classrooms

  • Full Asbestos removal.
  • Complete strip out.
  • Floor finishes and Floor Screed.
  • Demolition of building
  • Removal of prefab classrooms
  • Removal of all substructures.
  • Crush and stockpile on site.

Location: Calvert House, Belfast.

Contractor: MSM Contracts Ltd

Job Description: Demolition and Alterations to 6 Storey building (Formerly known as DV8) located in the middle of Belfast City Centre.

  • Complete Soft strip of building.
  • Concrete stair and lift shaft removal.
  • Removal of large glazed front.
  • Demolition works to concrete floors.
  • Design and Installation of large temporary works to maintain structural integrity and stability.
  • Works complete in the immediate vicinity of pedestrians and a busy road network.
  • Waste segregated and removed off site for disposal in local recycling facilities.

Location: Norwich Union House, Belfast

Contractor: McAleer and Rushe Properties.

Job Description: 7 Storey Building Demolition and Alteration works.

  • Non-Licenced Asbestos removal.
  • Complete strip out of non structural elements.
  • Returning all areas back to concrete shell.
  • Removal of elevators and lift motors.
  • Waste segregation, removal and disposal.

Location: Adelaide Street Offices.

Contractor: Portview

Job Description: 6 Story Office Block.

  • Asbestos removal.
  • Complete strip out.
  • Floor finishes and Floor Screed.

Location: Cootehill School.

Contractor: Tracy Bros Construction.

Job Description: Complete Demolition of a school and adjacent prefab classrooms.

  • Asbestos removal.
  • Complete strip out.
  • Floor finishes and Floor Screed.
  • Demolition of building
  • Removal of prefab classrooms
  • Removal of all substructures.
  • Crush and stockpile on site.

Location: Carryduff Shopping centre.

Contractor: Mascott

Job Description: Large scale shopping mall.

  • Asbestos removal.
  • Complete strip out.
  • Demolition of building structural steel.
  • Removal of all substructures.
  • Crush and stockpile on site.

Location: Diageo Belfast.

Contractor: Gem Interiors.

Job Description: Demolition of two number buildings.

  • Complete strip out.
  • Floor finishes and Floor Screed.
  • Demolition of buildings.
  • Reroute services.
  • Removal of all substructures.

Location: Grafton street Dublin- Old Brown Thomas building, completed.

Contractor: Portview

Job Description: 5 Storey Building

  • Asbestos removal.
  • Complete strip out.
  • Removal of escalators/Lifts.
  • Floor Screed.
  • Complete concrete Façade removal.
  • 50% of building structural demolition cut and carve.

Location: Black Rock shopping centre Dublin, completed.

Contractor: Mac Interiors

Job Description: 4 Storey Building

  • Asbestos removal.
  • Complete strip out.

Location: Care choice care home Swords, completed

Contractor: Ganson

Job Description: 4 single Storey Buildings

  • Asbestos removal.
  • Complete strip out.
  • Complete demolition.

Location: St Johns/ St Pauls National school Drogheda, completed.

Contractor: Felix O’Hare

Job Description: Two Storey Building

  • Complete strip out.
  • Complete demolition.

Location: DCU Alpha Dublin, completed.

Contractor: Felix O’Hare

Job Description: 6 Storey Building

  • Asbestos removal.
  • Complete strip out.
  • Screed removal.
  • Façade removal.

Location: Westland Row, completed

Contractors: Conack

Job Description: Multiple single/Multi Storey Building

  • Complete strip out of listed building.
  • Demolition of building down to foundation level.
  • Removal of all rubble offsite.

Location: River House High street , Belfast city centre, Northern Ireland.

Contractors: Mac-group.com

Job Description:

  • Internal strip out of 14 storey building.
  • Removal of floor screed throughout entire building.
  • Structural Alterations throughout the building.
  • Removal and disposal of plant room pipes and equipment from the 14th Floor.
  • Removal of external cladding and windows.
  • Disposal of all waste to local recycling facility.

Location: McArthur Building, Methodist College, Belfast

Contractors: Woodvale

Job Description:

  • Internal Soft strip.
  • Demolition of a single storey brick & block school building as well as grubbing up of concrete within the courtyard.
  • Demolition of Internal walls within the dorm rooms.
  • Removal of existing fireplace & Chimney.
  • Removal of internal staircases.
  • Waste removal following ISO 14001 procedures.

Location: Gilpins Factory, Belfast, Northern Ireland.

Contractors: Heron Bros.

Job Description:

  • Full Demolition works.
  • Asbestos removal.
  • Salvage Brick for client reuse.
  • Site Clearance.
  • Crush and stockpile rubble in nominated location to be graded as 6F2 and reused around site in line with KPI’s.
  • Separation cuts to protect existing housing developments garden walls.
  • Removal of all mixed waste off site and disposed into local recycling facilities.