Commercial / Belfast

Titanic Belfast

Gallery deconstruction

Internal deconstruction to support renewal of the visitor attraction, including structural works within Gallery 9.

Harte operatives carrying out internal deconstruction at Titanic Belfast
01 / Understand

The challenge.

  • The landmark visitor attraction remained live, with retained finishes and adjacent areas to protect.
  • Gallery 9 included a tiered slab, stairs, columns and exhibition elements.
  • Restricted internal access required agreed material routes and goods lifts.
02 / Control & deliver

Harte’s solution.

  • Established protected work areas with task lighting, scaffold access and exclusion zones.
  • Removed exhibition elements before the tiered slab, stairs and structural steel.
  • Used hand tools and controlled cutting, with designated waste routes and daily cleaning.
The result

Delivery.

Exhibition and structural elements deconstructed within the existing building.