Partial demolition of the multi-storey car park and enabling works for the wider Battery Green redevelopment.
01 / Understand
The challenge.
Retail units within the retained structure continued to operate.
Retained buildings, a live substation, public roads and pedestrian routes bordered the work.
Restricted access and noise, dust and vibration limits shaped delivery.
02 / Control & deliver
Harte’s solution.
Sequenced asbestos removal, soft strip and controlled structural demolition.
Used robotic demolition and high-reach plant around the retained structure.
Crushed and tested concrete for 6F2 reuse, with controlled traffic and dust suppression.
The result
Delivery.
Demolition and enabling works completed with protection of retained retail areas and the live substation, construction of a new substation and preparation of a piling mat for future works.