Skip to content
Healthcare / Ballymena 
Let’s discuss
Braid Valley Hospital
Controlled removal of a brick chimney, boilers and associated steelwork within a live hospital site.
01 / Understand
The challenge.
- Adjacent buildings required close monitoring during demolition.
- Work at height called for a controlled top-down removal sequence.
- Roof steelwork and tanks required planned lifting and safe handling.
02 / Control & deliver
Harte’s solution.
- Planned chimney dismantling from scaffold using handheld breakers.
- Reduced the scaffold in stages as the chimney came down.
- Used crane lifts for steelwork and tanks, with controlled waste removal.
The result
Delivery.
Brick chimney, boilers, steel structures and associated walls removed safely and on time.
Let’s discuss
your project.
Send us your scope, programme and site constraints. We’ll help plan a safe, practical route to delivery.
