Education / UCD Belfield, Dublin 
Let’s discuss
O’Brien Centre for Science
Asbestos-panel removal, new floor openings and dismantling of the concrete link bridge between two operational science buildings.
01 / Understand
The challenge.
- Asbestos panels needed removal before demolition could proceed.
- Live services and operational buildings surrounded the work areas.
- The link bridge required a planned lifting and removal sequence at height.
02 / Control & deliver
Harte’s solution.
- Coordinated specialist asbestos removal ahead of structural work.
- Formed floor openings using controlled cutting, propping and dust suppression.
- Used Brokk demolition and a coordinated crane plan, with scaffold protection and exclusion zones.
The result
Delivery.
Floor openings formed and the concrete link bridge dismantled between operational science buildings.