Kilroot Power Station
Bridge & GCB room removal
Dismantling of steel bridge structures and demolition of GCB rooms within an operational power station.
01 / Understand
The challenge.
- Live services included pressurised hydrogen lines.
- Structural stability, work at height and lifting constraints shaped the sequence.
- Plant movements and demolition areas needed coordination within the operating facility.
02 / Control & deliver
Harte’s solution.
- Sequenced work around live services, with out-of-hours working to meet client requirements.
- Dismantled and lowered three steel bridge structures using an overhead gantry crane.
- Used engineered protection, temporary works and controlled exclusion zones.
The result
Delivery.
Three steel bridge structures and associated GCB-room elements removed within the planned demolition scope.