Marine / York Dock, Belfast

Barge removal & demolition

Recovery, dismantling and disposal of three asbestos-lined steel barges that were taking on water: LA2, SCOW and CB3.

A steel barge being lifted ashore at York Dock, Belfast
01 / Understand

The challenge.

  • A leaking vessel required ongoing pumping within an operational dock.
  • Restricted access, work beside water and asbestos-containing materials required specialist planning.
  • The lift sequence had to accommodate dock traffic and container movements.
02 / Control & deliver

Harte’s solution.

  • Planned a controlled lift sequence around the live dock environment.
  • Completed asbestos clearance before lifting the barges ashore.
  • Used cold cutting, controlled dismantling and continuous waste segregation.
The result

Delivery.

Three barges recovered and dismantled, with 208.79 tonnes recycled.

Let’s discuss
your project.

Send us your scope, programme and site constraints. We’ll help plan a safe, practical route to delivery.